
Cleanspace under flooring
Installed cleanspce under flooring

Insulation installed over cleanspace with rim joist spray foam
We installed rigid foam over the cleanspace and sealed all seams before spraying the rim joists

center beam foamed to reduce conduction
Reducing thermal bridging by insulating the center beam and posts